====== boatyard ====== ==== rudder (pre-engine removal) ==== * verify tiller angle/sweep obstructions * test against proposed cockpit backrests * **measurements for tiller -> rudder attachment bracket design** * remove from boat ==== remove engine ==== * remove from boat * crane * Danish Marine - 503-289-1436 * remove driveshaft, cutlass bearing * **remove/redesign skeg?** ==== rudder ==== * verify/reshape to design profile if necessary * sand, surface & prep for paint * design/install windvane attachment points onto rudder ==== head ==== * **cut in new door** * patch aft opening * **install head/nav station bulkhead** * prep head floor & shower pump * remove seacock, patch hull ==== propane locker ==== * **design/construct deck surface hatch** * design/construct container ==== misc ==== * demo existing depth transducer * confirm sizing for new transducer housing * **measure port hole spacing** * re-mark/cut for new spacing/symmetry ===== supplies ===== * chain hoist, trolley, ibeam * crane * SS hardware for propane access hatch * McMaster order (Thurs 4/28) ====== shop/home ====== * buy/setup bandsaw * new bandsaw outlet * same circuit as table saw - convert to 220V? * build frame (with hinges) for sewing machine * test water pump * test instruments * bottle opener on plate steel geometry?